Gippsland Line Upgrade - Avon River Bridge upgrade
The Gippsland Line Upgrade has already delivered benefits, with level crossing upgrades allowing modern VLocity trains to run to Bairnsdale for the first time.
Construction of a new rail bridge over the Avon River now allows trains to travel at up to 90km/h, no longer needing to slow to 10km/h in this section.
CPB
Victoria
15 September, 2020
3 May, 2021